LightStream™ high strength stitch bonded fabrics by iPL. This is
the liner used every-
where in the world in
the construction of
wind driven power
plants, aircraft, boats
and automobiles.
This same know-how
forms the technological basis for a unique stitch bonded solution for the rehabilitation of sewer and water pipes.
Proven with over 3
million feet installed worldwide.
|
Reinforced Fiberglass Liner
Installation Process
See Before and After Examples
Product procurement
• Appropriate LightStream™ material is
produced to order with exacting quality control
Site discovery and preparation
• Pipe performance review
• Records analysis
• Planning meetings
• Visual inspection and measurements
• Environmental/neighborhood impact
assessment
• Traffic control activated
• Cleaning and debris removal
• TV equipped EyeBotix™ robot inspection
of pipe
• Lateral openings inspection and location, recorded using proprietary OpenEye™
ttttechnology
• Recordings reviewed and analyzed by team
• Equipment delivery and setup
• Personnel briefings by project manager
• Flow diversion to isolate the affected pipe
• Renovation of damaged lateral connections
Liner Installation
• Delivery of liner material to installation site
• Winching of pre-liner through the pipe
• Winching of LightStream™ through pipe
Curing
• Pulling of gates on the liner and initiation of
air pressure
• Introduction of proprietary EyeBotix™ UV
light chain into the pipe
• Start UV light
• Proprietary OpenEye™ tracking and
monitoring
• Operation of UV-chain under constant speed
and pressure
• Switch off the UV-Light
• Gradual pressure reduction
• Reinstallation of gates
Reintegration of pipe into system
• Reopening of “blind” laterals with
proprietary Eyebotix™ technology
• Inspection and approval by project manager
• Pipe brought back onto system, stronger
than when new
• Site review and withdrawal of work team
• Report preparation
Home ● About ● AirStream ● LightStream ● Spintech ● Eyebotix ● Media ● Contact Us
|
|